Chapter 6.80 SURFACE MINING AND RECLAMATION
Section 6.80.190 Periodic review of surface mining permit and reclamation plan.
Surface mining permits and approved reclamation plans shall
be reviewed by the planning
commission, in accordance with the schedule adopted at the time of approval according to
Section 6.80.180(C) of this chapter, to consider new or changed circumstanced within the general
area of the mining operations that should be accommodated by the permit or plan. The review
shall include a public hearing as specified by Section 6.80.150 of this chapter. At the conclusion
of the public hearing, the planning commission may modify the permit or reclamation plan to
conform with this chapter, and such modified permit or plan shall be binding upon the operation.
(Ord. 99-60 (part): prior gen. code § 8-117.5)