Castro Valley Streetscape Program
Overview | Schedule |
Conceptual Drawings/Photos | Project Update
Overview
Creating a Pedestrian "Main Street" for the Castro Valley Community
To create a safe, comfortable and attractive pedestrian main street for downtown Castro Valley, a series of street improvements are currently being implemented for Castro Valley Boulevard.
These improvements intend to:
- calm the traffic environment by reconfiguring traffic lanes and providing on-street parking with bicycle lanes while still maintaining adequate traffic capacity on the Boulevard; and
- create a beautiful and inviting pedestrian environment that will encourage the community to come here for shopping, dining and entertainment by providing widened sidewalks with ample seating areas, a canopy of street trees and planter beds, landscaped bulb-outs, street furnishings and gateway markers.
The Project will be constructed in multiple phases. Phase I of the Project will include Castro Valley Boulevard between Redwood Road and San Miguel Avenue. This phase of the Project includes design and construction of the following elements:
- Widened sidewalks and bulb-outs
- Street tree planting and tree grates
- Improved medians with landscaping
- Decorative pavers in bulb-outs and sidewalk planting strips
- Street furnishings including newsracks, benches, bollards and trash cans
- Decorative streetlights
- Gateway markers
- Banners
The following documents are provided in Portable Document Format (PDF) and require the free Adobe Reader.