Fees Required for Permits:
Beginning November 1, 2023 the following fees shall apply:
- Work Type: A permit to construct, rehabilitate, or destroy wells including Water Supply Wells, Cathodic Protection/Anode Wells, all types of Monitoring Wells, Piezometer/Inclinometer/Seismic Monitoring Wells, Geothermal Heat Pump-Construction.
Cost: $660.00 per well
- Work Type: A permit to bore exploratory holes, including Contamination Study, Environmental/Monitoring Study, Geotechnical Study, CPT's, Direct Push Sampling.
Cost: $445 per site for 4 or fewer and $85 each over 4
- Work Type: Construction and destruction of any types of remediation systems, including vapor probes/vapor points for sampling, vapor injection/extraction boreholes or remediation wells, sparge wells, recharge wells, and In Situ Treatment Boring Holes.
Cost: $445 per site for 4 or less and $85 each over 4
* A site includes the project parcel as well as any adjoining parcels.
*If the permit applicant decides not to perform the work after securing a permit, the applicant will be entitled to a refund of the permit fee at 70% of the fee. The 30% reduction represents the administrative cost of processing and issuing the permit.
*Permit Fees are exempt for State & Federal Projects. The state or federal would be exempt from paying well permit fees, but only if the State or Federal were the applicant on a state project or a federal project.
Site work shall be a project on state-owned property or federal-owned property.